In the winter months while the corridors are closed for the wintering of the bats, the fire control post (S414) has been refurbished.
In April a number of meters of narrow-gauge railway, made available by the Stoomtrein Valkenburgse Meer foundation, was installed at the fire control post in the corridor.
Facebook Comments
Please follow and like us: