In July concrete slabs were supplied for the restoration of the collapsed parts of the corridors north of the fire control post.
The plates are placed at the location of sagged metal grids in the main corridor. With this the system is connected again so that the sand from the northern corridor can be safely removed.
Facebook Comments
Please follow and like us: