Drilling a hole for a high voltage cable

The cables have been pulled from corner Nortghodreef / Duinweg. The fourth cable has yet to be pulled.

Drilling the hole for the 150 kV cable, under the crew bunker, ending at the beach, has succeeded.
Facebook Comments