Posted on 1 February 20143 April 2018 by Jeroen van der ZalmDrilling a hole for a high voltage cable The cables have been pulled from corner Nortghodreef / Duinweg. The fourth cable has yet to be pulled. Drilling the hole for the 150 kV cable, under the crew bunker, ending at the beach, has succeeded. Facebook Comments Share Tweet Share